Skip to the guide

How to Write an SOP With ChatGPT From a Live Walkthrough

By SmartCreatorHub ·

To write a standard operating procedure (SOP) with ChatGPT, have the person who does a recurring task show how they do it, or use an approved transcript of an earlier walkthrough. Give ChatGPT the steps, exceptions and checks that prove the work is done. Ask it to flag missing facts. Have someone else try the normal case and one exception before the process owner approves the procedure.

Download the editable Word template

Free one-page SOP template for delegating a recurring task

Choose one job the next person will repeat, such as scheduling the weekly newsletter or preparing a monthly report. Write what starts it, who has authority to act, what to do when a requirement is missing, and where to check that the work is done.

Blank SOP template

Task and result: [task] → [observable result]
Owner, backup and approver: [roles and approval channel]
Trigger and prerequisites: [start event, inputs, sources and access]
Standard steps: [role, action, condition, source ID, expected result]
Stop or exception: If [condition], stop before [action]. Ask [role] at [location]. Resume after [verified condition].
Done and log: Check [evidence] in [location]. Record [reference, version, time, owner, result and next action].
Control: [version, approving role, effective date and next review]
Download Word template

Filled example for a weekly client newsletter

Trigger
The versioned proof is ready for approval.
Owner and approver
The Production Owner schedules. The Client Approver signs off in the shared review thread.
Condition for scheduling
The approval names the exact proof version and send slot by 2 p.m. Eastern Time on the preceding business day.
Stop condition
If valid approval is missing at cutoff, keep the job out of the queue and request a new slot.
Completion evidence
Verify one matching pending job. Log its reference with the approval, version, slot and owner.

References for procedure structure and review · Atlassian SOP template · EPA guidance on preparing SOPs

What to capture during a process walkthrough

Ask the person who does the job to show one ordinary run and one case where they have to make a different decision. When they say “usually” or “I know when it’s ready,” ask for the exact condition, who decides and what they check afterward. Capture the start condition, the action, the exception and the result a teammate can verify.

Reuse an approved transcript, notes or images

Paste only the passages that establish an action, a decision or a completion check. Give them IDs such as T01. If the speaker says “click here,” attach an approved still and use its exact control label. If the still leaves the label unclear, ask the process owner. For an existing video, review the relevant moment and bring the verified text and still into the draft separately. Add images in ChatGPT.

Check that the material covers the role, usual path, exception and finished result before drafting. If the source is a client-hosted Teams call and you still need the transcript, see the guide to transcript access after the meeting.

Capture a live walkthrough with Granola

Agree with participants on transcription, screenshots and who may see the material. Ask the process owner to share a clean demo window. Keep written notes together if capture is outside what you agreed, then have the owner confirm the rules. Granola’s snapshot privacy guidance.

  1. Set up the capture. In the current Granola desktop app, open the meeting note. Go to Settings → Preferences → Features and turn on Take snapshots of shared screens. It supports macOS 14 or later and Windows 11 or later with compatible meeting apps, including Google Meet in Chrome on Windows 11. Keep the meeting window visible. Granola can attach stills from someone else’s share. Take an approved screenshot manually if you are presenting or a key screen is missed. Snapshot setup and limits.
  2. Pause transcription and turn off snapshots. If the walkthrough reaches sensitive material, select Stop in the transcript panel to pause transcription. Separately select Turn off for this meeting in the snapshots controls. Granola’s Enterprise redaction applies only to eligible transcripts. Review snapshots and typed notes separately. Transcript controls · Snapshot controls · Redaction limits.
  3. Verify the evidence. Copy the relevant transcript chunk. From a summary line, use the magnifier to find the supporting quote and jump to its source. Check the exact wording and the screen in the Images stack. Paste the approved excerpt and add an approved image in ChatGPT. Trace a summary to the transcript · Find the images.

Try Granola for your next live walkthrough

SmartCreatorHub may earn a commission from qualifying referrals.

If your ChatGPT workspace supports the Granola connector, it can view an accessible attached photo or snapshot on Granola Basic. Verbatim transcript tools through the connector require a paid Granola plan. For one SOP, you can paste the approved excerpt and attach your own approved image. Connector tools · Access details.

Choose a replay or a click-by-click guide

Keep a video such as a Loom recording if the next operator needs to replay a narrated demo. Granola has no audio or video file to replay. Loom Starter caps each recording at five minutes, so a 12-minute demo needs a plan that covers the full length. Loom’s AI Suite can also draft an SOP from the transcript and add relevant screenshots. Granola audio and video limits · Loom Starter limits · Loom’s SOP workflow.

For a task you perform yourself where the click sequence is what matters, Scribe can turn your actions into a guide with screenshots. Verify any approval or stop rule with the process owner whichever way you collect the evidence. What a Scribe captures.

Copy this ChatGPT prompt to turn a walkthrough into a procedure

Ask for the decision table before the prose. Give the instructions and proof separate labels. T01 can identify an approved transcript excerpt. I01 can identify a screenshot that shows the exact screen. Verify access, approvals and deadlines with the person who owns the process.

Use the approved numbered notes and images below. Draft a one-page SOP for a colleague who did not attend the walkthrough.

1. Start with a decision table. Use these columns: Action | Role | When to start or stop | Source ID | Expected result.
2. Write the trigger, prerequisites, ordered steps, exception paths, and the evidence that shows the task is complete.
3. Separate what happened in the demonstration from rules the team has approved. If a role, deadline, permission or screen label is missing, write “Needs confirmation” at the affected step. If sources conflict, cite both IDs and ask the process owner which one governs.
4. Give me two practice cases: a normal run and a case where work must stop. For each, state what to inspect and the expected result.

Task: [name and desired result]
Approved notes: [paste short excerpts labeled T01, T02…]
Approved images: [attach and label I01, I02…]

Reference · OpenAI Academy’s SOP drafting example for operations teams

Worked example: fix a late change before a newsletter goes out

A small agency schedules recurring client newsletters. The next Production Owner needs an exact approval rule and a procedure for late edits. These six records inform the draft.

Source records for the newsletter SOP
IDHandoff record
N01The Production Owner prepares the proof, checks it and schedules it. A named backup takes over after a transfer is entered in the project log.
N02The Client Approver explicitly approves the exact package version and send slot in the shared project review thread. A DM, reaction or another reviewer’s reply leaves approval pending.
N03The proof includes subject, preheader, sender, audience, content, links and slot. Approval is due by 2:00 p.m. Eastern on the preceding business day.
N04If matching approval is missing at cut-off, hold the issue unscheduled and request a new slot.
N05A required edit invalidates approval, including a subject typo. Confirm any original job is out of the queue. The slot can be reused if the new version is approved by the original cut-off. After cut-off, obtain fresh approval for the new version and slot.
N06Verify the configured sender, audience, proof and links. Check the pending send list for duplicates. Keep the approval link, version, slot and queue reference in the project log.

The draft line that fails the late-change case

After approval, the Production Owner can fix minor wording without requesting approval again. Keep the original send time.

At 3:07 p.m. Eastern on Tuesday, the Client Approver directs a subject typo correction to the queued V3. The draft would let the old slot stand. N05 requires a hold, including for this typo. The corrected result has V3 removed and V4 outside the queue. The next approval must name V4 and its new slot in the review thread by the cut-off for that new slot.

One-page SOP for the next newsletter run

  1. Post the proof. Assign the issue and version IDs. Use N03 to assemble the package and show the proposed slot and cut-off.
  2. Verify approval. Open the shared review thread. Check the approver, version, slot and time. If approval is missing when the cut-off passes, leave the issue unscheduled, log HOLD_APPROVAL and ask for a new slot.
  3. Check, schedule and log. Match the configured sender, audience, proof and links. Resolve a conflicting pending job before you schedule. Queue one approved job, confirm its version and slot, and log SCHEDULED with the queue reference. Keep the same queue entry if it already matches.
  4. Recheck after any required edit. Unschedule the pending job and confirm removal. If you cannot verify removal, log ESCALATE_QUEUE, alert the account owner and hold the replacement. If the original already sent, log SENT_INCIDENT and escalate without resending. Get the new version approved by the original cut-off to reuse the slot. After cut-off, log HOLD_CHANGE, request a new slot and repeat the approval and queue checks.
  5. Record the handoff. Log the version, approval reference and time, slot and time zone, cut-off, current owner, queue reference and next action. A named backup takes over after the owner change is recorded.

Fictional team and data. The results come from checking the written rules against the scenarios.

Test the SOP before someone else runs it

Give a colleague who missed the walkthrough the draft and a small set of dummy jobs. Ask them to work in a test queue or describe the next action without sending anything. Record the expected state, what they observed and the instruction they had to guess. Fix that line and run the usual case and the exception again. EPA guidance on testing and reviewing SOPs

Check NL-041 V3 for Wednesday, December 2, 2026, at 10:00 a.m. Eastern. Its cut-off is Tuesday, December 1, at 2:00 p.m. Eastern. Use the review thread to verify authorization and the pending send list to verify the queue.

What the corrected SOP produces on retest
CaseInputExpected observable result
C01Client Approver approves V3 and the Wednesday slot in the review thread at 1:42 p.m. Tuesday. Preflight passes at 1:46 p.m. and the queue is clear.SCHEDULED. One pending job for V3 at the approved slot.
C02Cut-off passes with a DM and a reaction.HOLD_APPROVAL. No pending job. Ask for a new slot.
C05The backup sees a matching pending job after a logged transfer.SCHEDULED. Reuse its reference and leave one job in the queue.
C03A required edit arrives at 3:07 p.m. after cut-off.HOLD_CHANGE. V3 removed. V4 stays out until fresh approval names V4 and its new slot by that slot’s cut-off.
C06The owner cannot confirm removal of V3.ESCALATE_QUEUE. Alert the account owner or admin and hold the replacement.
C07The original issue has already sent.SENT_INCIDENT. Keep the sent-job reference and escalate without resending.

Release only the version that passed the check

If the owner and backup disagree about who acts when the approver is away, hold the draft. Ask the process lead to confirm who is authorized and when. Keep the affected action blocked while authorization is unresolved. Retest that branch, then record the signed revision, signer and role, approval reference, effective date and next review. Put the approved SOP where the operator starts work.

Sources